RAW STATE
■ Architectural concept
■ Technical design documentation
■ CLT timber residential modules
■ Fasteners and straps required to install modules on site
■ Exterior window and door joinery
■ Securing the modules for transport
■ Set of installation instructions
DEVELOPMENT STATE
Raw state equipment+
■ Finishing layers on the floor - thermal and acoustic insulation, dry screed
■ Finishing of the walls and ceiling with new plasterboards without mudding according to the project
■ Finishing the bathroom with plasterboards without mudding
■ WC flush-mounted installation system
■ Internal electrical and teletechnical installations
■ Smart Home system + Grenton touch panels for self-assembly
■ Electrical switchboard
■ Internal plumbing
■ Mechanical ventilation with recuperation
■ Recuperator
■ Water underfloor heating
■ Boiler room equipment - buffer tank, hydraulic tower
■ Air-to-water heat pump
“TURNKEY” CONDITION
Developer’s state equipment+
■ Floor panels and skirting boards
■ Mudding + painting of plasterboard ceiling walls
■ Tiles on the floor of the boiler room
■ Complete bathroom - waterproofing, tiles, and white-ware installation
■ Tiles over the countertop in the kitchen
■ Fixed furniture (closet in the vestibule, closet in the bedroom, kitchen furniture, cabinet under the sink in the bathroom)
■ Sink and faucet in the kitchen
■ Sockets and switches
■ Installation of Smart Home touch panels
■ Interior lighting fixtures (excluding standing and desk lamps)
■ Upholstered panels + decorative moldings behind the bed in the bedroom
■ Wooden interior doors
■ Interior glass doors (in the vestibule)